Quick Tip
MCWA’s Shoremont Water Treatment Plant can produce up to 140 million gallons a day.
Engineering Data
Uniform Design and Construction Standards for Extending Water Distribution Systems
- Section 1 – Table of Contents / General Requirements
- Section 2 – Design Standards
- Section 3 – Construction Requirements
- Section 4 – Materials and Performance Specifications
- Section 5 – Standard Details
- Appendices Index
- Appendix A – Main Extension Agreement (MEA)
- Appendix B – Private Main Extension Agreement Off A Public Main (PMEA)
- Appendix C – Water Service Installation Agreement (WSIA)
- Appendix D – Private Fire Protection Service Agreement
- Appendix E – Proposed Project Data Sheet
- Appendix F – Water District Main Extension Agreement (WDMEA)
- Appendix G – Engineer’s Report for Approval of a Backflow Prevention Design
- Appendix H – NYSDOH DOH-347 Form
Backflow Prevention Requirements for Residential Water Driven Sump Pumps
MCWA Approved Materials List